Library / Guideline for Management of GHG and Fugitive Emissions from Midstream and Downstream Petroleum Operations
Guideline for Management of GHG and Fugitive Emissions from Midstream and Downstream Petroleum Operations
Page 16 of 49
<¢ NIGERIAN MIDSTREAM AND kc DOWNSTREAM PETROLEUM Yj REGULATORY AUTHORITY (NIVDPRA) Applicable to all Midstream and Downstream Petroleum Operations GUIDELINES FOR MANAGEMENT OF GREEN HOUSE GASES (GHG) AND FUGITIVE EMISSIONS FROM MIDSTREAM AND DOWNSTREAM PETROLEUM OPERATIONS IN NIGERIA After this initial two (2) year period, any sputtering or smoking flare shall be addressed within 60 days of detection. f. The provisions of e (i - ii) do not substitute for the annual flare control test as prescribed in Section 3.4.2. g. Audio, Visual, and Olfactory (AVO) inspection shall be conducted daily, weekly - or monthly as required by the organisation's monitoring plan. 3.2.6 Requirements for Repair: A licensee or permit holder shall attempt first repair within these periods: Sab. | 3.2.6.2 Q) Leaks equal to or greater than 50,000 parts per million (pm) by volume, categorised as Large Leaks, shall be repaired within 5 working days of detection. Leaks less than 50,00009m by volume, categorised as Small Leaks, shall be repaired within 14 days of detection. Fugitive emissions component shall be considered repaired when: a. Emissions cannot be detected by infra-red camera or any other detection technology. fb. A concentration of hydrocarbons below 500 pom or emissions not detected by EPA Method 21. For a critical component that cannot be repaired without shutdown, the leak shall be minimized within 24 hours of detection by the licensee or permit holder and a repair scheduled by the end of the next planned process shutdown or within 12 months,
GuidelinesPDF202516