Library / Applicable to all Oil & Gas Operators Service Providers GUIDELINES AND PROCEDURE FOR LIFTING EQUIPMENT AND LIFTING OPERATIONS
Applicable to all Oil & Gas Operators Service Providers GUIDELINES AND PROCEDURE FOR LIFTING EQUIPMENT AND LIFTING OPERATIONS
Page 20 of 26
Applicable to all Oil & Gas Operators
and
Service Providers
GUIDELINES AND PROCEDURE FOR LIFTING EQUIPMENT AND LIFTING
OPERATIONS
Code: DPR Guide 0024 - 2020
Revision Date: 1st August 2020
This is a property of the Department of Petroleum Resources. All rights reserved
20
5
APPENDICES
5.1
Lifting Equipment: Frequencies for Testing / Inspection & Certification
Lifting Equipment Type
Frequency For
Proof Load Test
Inspection (SWL)
1.
All Lifting Accessories:
•
Chains, slings and wire
ropes slings
•
Rings, links, hooks,
shackles, eyebolts,
swivels, blocks, snatch
blocks
•
Beam and plate clamps,
frames, pallets, lifting
beams and cargo nets.
•
On initial supply
•
After substantial alteration or Major repair
•
At discretion of surveyor
Every six (6) months
2
Lifting Equipment:
•
Pedestal cranes, mobile
cranes, forklifts, tower
cranes
•
Overhead traveling
cranes, wall / pillar
cranes, derricks
•
Winches, hoist (air and
electric), crabs, Telfer
hoist, powered working
Platforms, vehicle lifts
or hoists etc.
•
Mobile or movable jacks
and associated “Lifting
Equipment”
•
Lifting Persons &
Suspended Baskets *
•
On initial supply
•
Every four (4) years
•
After reinstallation, substantial alteration or major
repair
•
At discretion of surveyor
Every twelve (12)
months
Every Six (6)
Months*
3
Runaway beams, pad eyes,
gin pole and gin wheels.
• On initial supply
• After reinstallation, substantial alteration or major
repair
• At discretion of surveyor
Every twelve (12)
months
Every six (6) months
4
Chain Blocks, tirfors, pull lifts,
trolleys
• On initial supply
• Every four (4) years
• After substantial alteration or major repair
• At discretion of surveyor
Every six (6) months
CodesPDF20202020-0820