Afrindustria/ Gas Gap Monitor

Library / Applicable to all Oil & Gas Operators Service Providers GUIDELINES AND PROCEDURE FOR LIFTING EQUIPMENT AND LIFTING OPERATIONS

Applicable to all Oil & Gas Operators Service Providers GUIDELINES AND PROCEDURE FOR LIFTING EQUIPMENT AND LIFTING OPERATIONS

Page 21 of 26

Open the PDF at page 21

 
 
 
 
Applicable to all Oil & Gas Operators 
and 
Service Providers 
GUIDELINES AND PROCEDURE FOR LIFTING EQUIPMENT AND LIFTING 
OPERATIONS  
Code: DPR Guide 0024 - 2020 
 
Revision Date: 1st August 2020 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
21 
5   
Lifts – (passenger or goods)   
  
• On initial supply   
• Every four (4) years   
• After substantial alteration or major repair   
• At discretion of surveyor   
Every twelve (12) 
month   
  
Every six (6) months 
6   
Escalators and Elevators   
  
• On initial supply   
• Every one (1) year   
• After substantial alteration or major repair   
• At discretion of surveyor   
Every six (6) months