Applicable to all Oil & Gas Operators and Service Providers GUIDELINES AND PROCEDURE FOR LIFTING EQUIPMENT AND LIFTING OPERATIONS Code: DPR Guide 0024 - 2020 Revision Date: 1st August 2020 This is a property of the Department of Petroleum Resources. All rights reserved 9 xi. Operation of all limit switches or cut-outs and safety devices. Caution to be exercised in making the checks in the event of non-operation. 2.9 Working Load Limit (WLL) This means the maximum load (mass), which any piece of lifting equipment may lift safely in the most efficient configuration. For wire rope sling, chain slings and fibre rope slings, this is in direct lift i.e. eye to eye in a straight vertical line/ hitch. 2.10 Safe Working Limit (SWL) This means the maximum load (mass), which any piece of lifting equipment may lift safely in a particular configuration, other than its most efficient configuration. e.g. for a wire rope sling choked on a square load without any corner protection, its safe working load is approximately 50%; choker hitch should be 80% of its WLL. 2.11 Proof Load Test This implies the application of a predetermined load excess of SWL to assess the ability of the equipment to withstand operation requirements. This applied proof load shall never exceed the elastic limit of the item being tested. The amount of Proof Load to be applied will vary depending upon the type of equipment, its SWL, and the applicable Standard. On completion of any proof load test, the “Lifting Equipment” is to be fully inspected to ensure that the structural integrity of the equipment has not been impaired. 3 PROCEDURE FOR LIFTING OPERATION 3.1 General Requirements Lifting equipment is so constructed or adapted as to be suitable for the purpose for which it is used or provided, and to have regard to the working conditions and risks to health and
CodesPDF20202020-089