Library / Applicable to all Oil & Gas Operators GUIDELINES FOR COMPLIANCE WITH THE TECHNICAL SAFETY CONTROL (TSC) REQUIREMENTS FOR FACILITY DEVELOPMENT PROJECTS AND MODIFICATIONS
Applicable to all Oil & Gas Operators GUIDELINES FOR COMPLIANCE WITH THE TECHNICAL SAFETY CONTROL (TSC) REQUIREMENTS FOR FACILITY DEVELOPMENT PROJECTS AND MODIFICATIONS
Page 4 of 8
Applicable to all Oil & Gas Operators GUIDELINES FOR COMPLIANCE WITH THE TECHNICAL SAFETY CONTROL (TSC) REQUIREMENTS FOR FACILITY DEVELOPMENT PROJECTS AND MODIFICATIONS Code: DPR Guide 0032 - 2020 Revision Date: 1st August 2020 4 This is a property of the Department of Petroleum Resources. All rights reserved. 1. PREAMBLE 1.1 Legal Provisions And Scope a. This guide is issued, pursuant to the provisions of the Mineral Oils (Safety) Regulations (MOSR) 1997 and all other related provisions of the DPR “Procedure Guide for the Construction and Maintenance of Fixed Offshore Platforms/Oil & Gas Facilities”. It shall be applicable to all major phases in the life cycle of facilities development/modification projects namely: i. Conceptual and Front-End Engineering Phase ii. Engineering Design Phase iii. Procurement & Construction Phase iv. Commissioning Phase It shall apply to all petroleum handling facilities in the Nigerian Petroleum Industry. b. It spells out the statutory procedures that must be followed by operators in achieving full compliance with the TSC requirements of their Facilities Development/ Modification Projects. c. The provisions of this guide supplement all other similar provisions contained in the Regulation/Procedure Guide cited in (a) above. 2. PROJECT SAFETY INFORMATION/DOCUMENTATION This Safety information which shall generally be in the form of project design drawings/documentation, but conveying relevant information required for the Technical Safety Control Reviews/Studies, shall be forwarded early (preferably 1 month to scheduled review) for DPR’s Safety Preview preparatory to each scheduled TSC Study/Review meeting. The operator shall also make available at the Review meeting(s), copies of necessary Industry Standards/Recommended Practice(s) (RPs) e.g. API RP 14C, 14J, 75, 500; equipment data
CodesPDF20202020-084