Library / Applicable to all Oil & Gas Operators GUIDELINES FOR COMPLIANCE WITH THE TECHNICAL SAFETY CONTROL (TSC) REQUIREMENTS FOR FACILITY DEVELOPMENT PROJECTS AND MODIFICATIONS
Applicable to all Oil & Gas Operators GUIDELINES FOR COMPLIANCE WITH THE TECHNICAL SAFETY CONTROL (TSC) REQUIREMENTS FOR FACILITY DEVELOPMENT PROJECTS AND MODIFICATIONS
Page 5 of 8
Applicable to all Oil & Gas Operators GUIDELINES FOR COMPLIANCE WITH THE TECHNICAL SAFETY CONTROL (TSC) REQUIREMENTS FOR FACILITY DEVELOPMENT PROJECTS AND MODIFICATIONS Code: DPR Guide 0032 - 2020 Revision Date: 1st August 2020 5 This is a property of the Department of Petroleum Resources. All rights reserved. sheets, etc. to complement the Safety Information/ documentation available for review at the meeting. 3. SCHEDULING OF TSC REVIEW MEETING/STUDY The operator shall give early written notification (preferably 1 month to scheduled TSC Review meeting/activity) to DPR, and also ensure adequate arrangements for the participation of DPR representatives at the proposed meeting. The timing and duration of each meeting/study shall be chosen such that adequate technical coverage of the Objectives and Scope of the proposed study/review is achieved. 4. MINIMUM TSC REQUIREMENTS FOR FACILITY DESIGN, CONSTRUCTION, & MODIFICATION PROJECTS. 4.1 CONCEPTUAL & FRONT-END ENGINEERING DESIGN STAGE 4.1.1 CONCEPTUAL STAGE a. The Operator shall submit the project’s Concept Selection Studies Report for DPR's Review. b. Conducts a project’s Concept Safety Evaluation (CSE) Studies/Review with DPR participation. 4.1.2 FRONT-END ENGINEERING DESIGN (FEED) STAGE The Operator shall ensure that DPR representatives participate fully in the following Technical Safety Control (TSC) Studies/Reviews as they come up during the FEED phase of the project: - i. Qualitative Risk Assessment Review. ii. PFDs, P&IDs, & Coarse HAZOPS and/or HAZID Reviews. iii. Project Specifications Review. iv. Project Safety Case/HSE Reviews.
CodesPDF20202020-085