Library / GUIDELINES FOR THE ESTABLISHMENT HYDROCARBON PROCESSING PLANTS (PETROLEUM REFINERY AND PETROCHEMICALS) IN NIGERIA
GUIDELINES FOR THE ESTABLISHMENT HYDROCARBON PROCESSING PLANTS (PETROLEUM REFINERY AND PETROCHEMICALS) IN NIGERIA
Page 14 of 14
14 Milestone Prequalification for Refinery and Petrochemicals Plants Licenses and Approvals MILESTONE DATE APPROVAL STAGE LABEL DESCRIPTION QUALIFIED GRANTED EXPIRI NG LTE 1 Application and Statutory Payments (Fee, Service Charge and Refundable Deposit) (Section ll, 2.1.1) LTE 2 Preliminary Investment Support Package (Section ll, 2.1.2) LTE 3 Design Basis Development (Section ll, 2.1.3) LTE 4 Concept Selection and Process Configuration Studies (Section ll, 2.1.4) LICENSE TO ESTABLISH LTE 5 Safety, Health and Environment Considerations (Section ll, 2.1.5) ATC 1 Application and Statutory Payments (Revalidation and Relocations Only) (Section lll, 3.4& Vl, 6.3) ATC 2 Equipment Integrity Report (Relocations Only) (Section VI, 6.2) ATC 3 Refinery Configuration and Energy Balances (Section ll, 2.4.1) ATC 4 Project Execution and Quality Control Strategy (Section ll, 2.4.2) ATC 5 Process Safety and Utilities (Section ll, 2.4.3) APPROVAL TO CONSTRUCT ATC 6 Project Presentation (Section ll, 2.4.4) LTO 1 Application and Statutory Payments (Section lV, 4.1) LTO 2 Plant Reliability and Integrity (Pre- commissioning) (Section V, 3.5 & 3.6) LTO 3 Statutory Documentations (Section lV, 4.1 & 4.2) LICENSE TO OPERATE LTO 4 Pre-licensing Inspection (Section lV, 4.2)
GuidelinesPDF14