Library / GUIDELINES FOR THE ESTABLISHMENT HYDROCARBON PROCESSING PLANTS (PETROLEUM REFINERY AND PETROCHEMICALS) IN NIGERIA
GUIDELINES FOR THE ESTABLISHMENT HYDROCARBON PROCESSING PLANTS (PETROLEUM REFINERY AND PETROCHEMICALS) IN NIGERIA
Page 4 of 14
4 2.4 CONDITIONS GOVERNING THE ENGINEERING DESIGN OF A REFINERY, PETROCHEMICAL AND GAS PROCESSING PLANT The detailed engineering and equipment specifications must conform to acceptable national and international standards listed in Appendix II or their equivalents, so as to guarantee the safety and operability of the plant and equipment. This phase must be executed with full participation of DPR engineers in accordance to the official mandate for monitoring hydrocarbon process plants projects. The following milestone deliverables / documents should be submitted to the Director, Department of Petroleum Resources for review and approval to ensure statutory compliance: 2.4.1 REFINERY CONFIGURATION i) Final process configuration including detailed Piping and Instrumentation Diagram (P&ID) of the process units, utilities and offsite facilities. ii) Final process technology selection and licensors. iii) Detailed material and energy balances iv) Process flow diagrams of the plant v) Electrical single line diagram 2.4.2 PROJECT EXECUTION STRATEGY / QUALITY ASSESSMENT vi) Equipment test procedures (Detailed List of equipment) vii) Approved building plans viii) Quality control program of the designers ix) Final project implementation schedule x) Detailed crude oil (feedstock) supply and product meter proving procedure and evacuation schemes xi) Detailed Product Storage and Distribution Plan (Facilities Design, Layout and Metering) 2.4.3 PROCESS SAFETY CONSIDERATIONS / UTILITIES PROVISION xii) Electric power generation and plant earthen philosophy, xiii) Power distribution, load flow analysis and short circuit study. xiv) Control and instrumentations systems (process system and alarms, fire & gas system, ESD system) design and implementation. xv) Detailed Waste (Solid, Liquid and Gaseous) Disposal Program of the Refinery xvi) Detailed HAZOP report xvii) SAFE Chart xviii) 3-D Model Walkthrough reports xix) Cause and Effect Diagrams xx) Safety Equipment Layout xxi) General facilities Layout xxii) Detailed Environmental Impact Assessment 2.4.4 PROJECT PRESENTATION Every applicant for approval to construct a private refinery shall make a technical presentation of the entire project to DPR and shall be required to submit xiii) The names of prospective fabrication and construction contractors and the fabrication program. xiv) The yard in which all pressure vessels, columns and ancillary equipment would be fabricated. xv) Arrangements for statutory monitoring of the various stages of equipment fabrications by officials of DPR.
GuidelinesPDF4