GUIDELINES FOR THE ESTABLISHMENT HYDROCARBON PROCESSING PLANTS (PETROLEUM REFINERY AND PETROCHEMICALS) IN NIGERIA

Page 6 of 14

Open the PDF at page 6

 
6
 
The Honorable Minister of Petroleum Resources may approve the revalidation of an expired ATC upon 
appropriate recommendations from the Department of Petroleum Resources..  
The validity of a renewed ATC shall not exceed two (2) years and there shall be no renewals for a re-
validated ATC. 
 
3.5 
CONDITIONS GOVERNING THE CONSTRUCTION OF A REFINERY, PETROCHEMICAL 
AND GAS PROCESSING PLANT 
This comprises of fabrication, installation and erection stages. 
 
i) 
The refiner or plant operator shall provide the Department of Petroleum Resources with the 
following information for necessary reviews and approval before the commencement of 
fabrication: 
 
a). The name and job references of the company appointed as quality control inspectors and 
Curriculum Vitae (CV) of its principal technical staff.  
b). All fabrication and welding procedures.   
 
These procedures shall generally follow the relevant specifications in the under-listed 
documents: 
1. American Welding Society – Structural Welding Code A.W.S.D.1.1 88 and the subsequent 
revisions. 
2. API Standards 1104 – 17th and subsequent editions for welding of pipelines and related 
facilities. 
 
ii) 
At the completion of fabrication, the quality control inspecting company shall compile a report 
confirming that all materials used were strictly in accordance with approved specifications as 
verified through steel mill certificates with the approved Standards and Codes of Practice. The 
quality control inspection shall be by Non-Destructive Examination (NDE). Consequently, 
inspection and certification of all welded parts of vessels, columns and piping shall be by any of 
the following techniques as applicable viz.:  
a). Liquid Penetrant Technique 
b). Magnetic Particle Technique 
c). Radiographic Technique 
d). Ultrasonic Technique 
A comprehensive report of the inspection so carried out shall be forwarded to the Department 
through the refiner or plant operator. 
 
3.6 
ENVIRONMENTAL AND SAFETY CONSIDERATION IN HYDROCARBON PLANTS DESIGN 
AND CONSTRUCTION 
 
3.6.1 
ENVIRONMENTAL FACTORS 
These shall include all available meteorological parameters, such as the prevailing wind direction, 
maximum wind velocity, maximum and minimum atmospheric temperature, relative humidity, 
rainfall, local flood or tide conditions. 
a) 
All environmental parameters shall be obtained from independent site survey with all the data 
gathered being properly documented. 
b) 
Soil test and geo-technical investigations shall be carried out for foundation or load-carrying 
characteristics of the site. 
c) 
Contour maps (site plan), showing ground elevations shall be prepared 
d) 
Effect of borehole water withdrawal on ground water table shall be investigated and result 
submitted.