Library / Guidelines for Flare Gas Measurement and,Reporting in Midstream Petroleum Operations
Guidelines for Flare Gas Measurement and,Reporting in Midstream Petroleum Operations
Page 6 of 12
¢ NIGERIAN MIDSTREAM AND a); DOWNSTREAM PETROLEUM Osc REGULATORY AUTHORITY (NMDPRA) Applicable to all Midstream Petroleum Operations GUIDELINES FOR FLARE GAS MEASUREMENT AND REPORTING IN MIDSTREAM PETROLEUM OPERATIONS. Code: NMDPRA Guide 1 - 2026 Effective Date: January 2026 _ d. calculate the excess flare gas (V...) in line with section 2.4 of these Guidelines and ensure payment of applicable penalties into the MDGIF account, with evidence of payment submitted to the NMDPRA, no later than 21 days from the end of the month. 2.2 Flare Gas Measurement (Va) The flare gas volume from a facility shall be measured with an approved metering system. 2.3 Computation Flare Gas limit (V,_,,) The allowable gas flared from midstream petroleum operations, which is a sum of: Ya a Vi + Vp + Fey Where: (1) V oot = Allowable volume of flare gas from midstream facilities. Vi = Volume of Pilot gas for midstream facilities. Vi» = Measured flared gas during Upset. These include gas flared due to Unplanned operational disturbances: i. Equipment malfunction or failure (compressor trip, valve failure, etc.). ii. | Sudden pressure surges. iii. | Power outage or process control loss. V., = Controlled flare gas volumes due to known events as approved by NMDPRA. These include gas flared due to: i. Planned maintenance. i. Facility start-up. iii. Strategic operational reasons as testing, with prior advance consent of the Authority. iv. Other conditions the Authority may approve. This is a property of the Nigerian Midstream and Downstream Petroleum Regulatory Authority. All rights reserved.
GuidelinesPDF20262026-016