Library / Applicable to all Oil & Gas Operators GUIDELINES FOR FLARE GAS MEASUREMENT, DATA MANAGEMENT & REPORTING OBLIGATIONS Code: DPR Guide 0005 - 2020
Applicable to all Oil & Gas Operators GUIDELINES FOR FLARE GAS MEASUREMENT, DATA MANAGEMENT & REPORTING OBLIGATIONS Code: DPR Guide 0005 - 2020
Page 19 of 42
Applicable to all Oil & Gas Operators GUIDELINES FOR FLARE GAS MEASUREMENT, DATA MANAGEMENT & REPORTING OBLIGATIONS Code: DPR Guide 0005 - 2020 Revision Date: 1st August 2020 This is a property of the Department of Petroleum Resources. All rights reserved 19 ii. Highest value recorded by the meter over a 12-month period prior to the malfunctioning being identified and reported. 3. Associated Gas Own Consumption: During the period in which the allocation meter(s) is malfunctioning, the Producer will account for the data as per Section 4.9 of these Guidelines. To determine the Flare Payment Amount, the DPR will use the lower of: i. Accounted data ii. Lowest value recorded by the meter over a 12-month period prior to the malfunctioning being identified and reported. 4.12 Meter Calibration a. Production Meters, Flare Payment and Flare Gas Sales Fiscal Meters and Allocation Meters shall follow calibration procedures as defined in the “Procedure Guide for the Determination of Quantity and Quality of Petroleum and Petroleum Products” and the “Procedure Guides for the Determination of Quantity and Quality of Gas and Gas Derivatives at Custody Transfer Points” issued by the Department of Petroleum Resources (“The Procedure Guides”). b. The Department of Petroleum Resources may at any time direct a Producer, Permit Holder or Processing Facility to carry out a non-routine calibration of specific meters. 4.13 Meter Malfunctioning and Calibration Cure Period a. Producers: 1. A Producer will be allowed 90 calendar days to repair any malfunctioning meter referred to in these Guidelines.
CodesPDF20202020-0819