Library / Applicable to all Oil & Gas Operators GUIDELINES FOR FLARE GAS MEASUREMENT, DATA MANAGEMENT & REPORTING OBLIGATIONS Code: DPR Guide 0005 - 2020
Applicable to all Oil & Gas Operators GUIDELINES FOR FLARE GAS MEASUREMENT, DATA MANAGEMENT & REPORTING OBLIGATIONS Code: DPR Guide 0005 - 2020
Page 36 of 42
Applicable to all Oil & Gas Operators GUIDELINES FOR FLARE GAS MEASUREMENT, DATA MANAGEMENT & REPORTING OBLIGATIONS Code: DPR Guide 0005 - 2020 Revision Date: 1st August 2020 This is a property of the Department of Petroleum Resources. All rights reserved 36 9. SCHEDULE A Measurement Points for Producers and Permit Holders 10. Table 1: METER INSTALLATION POINTS ENTITY WHAT WHERE Producers Associated Gas Production per Flare Site In the flowlines immediately downstream of where Crude Oil, water and Associated Gas are separated (A1 and A2 above) Producers Producers Associated Gas volume for Own Consumption In the flowlines delivering gas to the consumption points (B above) Producers Sales to Existing Offtake Commitments (including Producers’ Associated Gas Utilisation Projects for Commercialisation) At the corresponding delivery point (C above) Producers Flare Gas sales to Producer’s Approved Flare Out Project At the corresponding delivery point (F above) Producers Flare Gas volume going to Flare Stack per Flare Site and per Field In the Flare Gas Header downstream of all possible Flare Gas Header junctions. No Flare Gas is allowed to by-pass the Flare Gas meter while being directed to the Flare Stack (G above). In the event that the Producer has a knock out drum installed in the Flare Gas Header, the Flare Gas meter should be installed downstream
CodesPDF20202020-0836