Applicable to all Oil & Gas Operators  
GUIDELINES AND PROCEDURES FOR OBTAINING DPR APPROVAL FOR 
TRANSFER OF LICENCE, RIGHTS OR INTERESTS IN THE DOWNSTREAM 
SECTOR OF THE NIGERIAN OIL AND GAS INDUSTRY 
Code: DPR Guide 0039 - 2020 
 
Effective Date: 1st September 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
13 
iv. 
Evidence of valid Minimum Industry Safety Training for Downstream Operations 
(MISTDO) for staff.  
v. 
Emergency response plan (ERP). 
vi. 
A set of plant operating manuals. 
vii. 
Environmental Evaluation Studies Report by the previous company/applicant. 
viii. 
Evidence of environmental compliance monitoring (ECM) report submitted to the 
Department for the last one year. 
ix. 
Deed of Lease or deed of Assignment with stamp duty (original & duplicate) and 
endorsed by the State or Federal High Court.  
x. 
Evidence 
of 
trained 
workers 
(Management 
Structure 
showing 
detail     
designations to run the plant no later than two years as at the date of application. 
xi. 
Evidence of availability of the following operational requirements: 
a. Approved operating manuals and maintenance manuals; 
b. Complete equipment reports on all critical equipment; 
c. Availability of adequate operating spare parts, chemicals, and other operating 
consumable materials; 
d. Availability of sufficient trained manpower; 
e. Management Structure showing detailed designations to run the plant; and 
f. Functional and effective firefighting organization. 
xii. 
Detailed report on Facility inspections (FI) of the office premises and or site 
location. 
 
4.5 
Specific Requirements for Refinery, Petrochemicals and Gas Processing Plants 
In addition to documents listed in Section 4.1, other required documents for Refinery, 
Petrochemicals and Gas Processing Plants include: