Library / Applicable to all Oil & Gas Operators GUIDELINES AND PROCEDURES FOR OBTAINING DPR APPROVAL FOR TRANSFER OF LICENCE, RIGHTS OR INTERESTS IN THE DOWNSTREAM SECTOR OF THE NIGERIAN OIL AND GAS INDUSTRY
Applicable to all Oil & Gas Operators GUIDELINES AND PROCEDURES FOR OBTAINING DPR APPROVAL FOR TRANSFER OF LICENCE, RIGHTS OR INTERESTS IN THE DOWNSTREAM SECTOR OF THE NIGERIAN OIL AND GAS INDUSTRY
Page 18 of 23
Applicable to all Oil & Gas Operators GUIDELINES AND PROCEDURES FOR OBTAINING DPR APPROVAL FOR TRANSFER OF LICENCE, RIGHTS OR INTERESTS IN THE DOWNSTREAM SECTOR OF THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0039 - 2020 Effective Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 14 i. Evidence of retrieval, from previous operator/owner, As-Built Engineering Diagrams and documentations, which must include: a. Piping and Instrumentation Diagram (P&ID) of the refinery/process units, utilities and offsite facilities; b. Process flow diagrams of the refinery/process plant; c. Plot plan / General facilities layout of the refinery/process plant; d. Electrical single line diagram of the refinery/process plant; and e. Structural drawings. ii. Evidence of securing or maintaining the following: a. Technical services agreement retention or renewal with refinery/plant process units’ licensors and royalty’s payment; b. Retrieval of all Facility Licences/approvals from previous operator; c. statutory instruments or documents such as C of O of refinery/plant site; d. Service agreement with contractors and vendors on refinery/plant operations and maintenance; e. Transitional operations arrangement and staffing; and f. Capitalization and Working capital available for refinery/plant operations. iii. Confirmation of availability of the following operational requirements: a. Approved operating manuals, maintenance manuals, mechanical catalogues, subject to appropriate modifications; b. Complete equipment reports on all critical equipment such as pressure vessels, fired heaters, boilers, rotating equipment and storage tanks; c. Completion of all fiscalization equipment and systems to approved standards; d. Availability of adequate spare parts, chemicals, catalysts, lubes, greases and other operating consumable materials in the warehouse appropriately codified and organized;
CodesPDF20202020-0918