Library / Applicable to all Oil & Gas Operators GUIDELINES AND PROCEDURES FOR OBTAINING DPR APPROVAL FOR TRANSFER OF LICENCE, RIGHTS OR INTERESTS IN THE DOWNSTREAM SECTOR OF THE NIGERIAN OIL AND GAS INDUSTRY
Applicable to all Oil & Gas Operators GUIDELINES AND PROCEDURES FOR OBTAINING DPR APPROVAL FOR TRANSFER OF LICENCE, RIGHTS OR INTERESTS IN THE DOWNSTREAM SECTOR OF THE NIGERIAN OIL AND GAS INDUSTRY
Page 20 of 23
Applicable to all Oil & Gas Operators GUIDELINES AND PROCEDURES FOR OBTAINING DPR APPROVAL FOR TRANSFER OF LICENCE, RIGHTS OR INTERESTS IN THE DOWNSTREAM SECTOR OF THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0039 - 2020 Effective Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 16 a. Piping and Instrumentation Diagram (P&ID) of the pipeline or pipeline network and ancillary systems; b. copies of structural drawings; c. copies topographical map of the pipeline drawn on Scale, showing the locations of the points at which other pipelines are crossed and indicating the operators of the pipelines being crossed; d. a survey description in accordance with the Nigeria National Grid, of the total route of the pipeline, indicating the width of the right of way with the coordinates of the various points of intersection; e. route of the pipeline with sections and quarter sections shown as rightly confirmed from the previous operator; and f. plan and profile of the pipeline showing the manner in which any highway, railroad, water way or other pipeline lying along the route was crossed. iii. Evidence of securing or maintaining the following: a. all issued permits and licence, and other safety & environmental approvals; b. the mechanical integrity report so far carried out on the pipeline(s) or pipeline network; and c. maintenance records of pipeline or pipeline network, with all inspection reports. iv. Evidence of retrieving narratives and schematics of pipeline showing attributes such as: a. the location/attributes of each point at which there is a change in any of: 1. outside or nominal diameter of the pipeline; 2. wall thickness of the line pipe material; 3. type and Grade of line pipe; 4. designed maximum operating pressure; or 5. direction of fluid flow along the pipeline.
CodesPDF20202020-0920