Library / Applicable to all Oil & Gas Operators GUIDELINES AND PROCEDURES FOR OBTAINING DPR APPROVAL FOR TRANSFER OF LICENCE, RIGHTS OR INTERESTS IN THE DOWNSTREAM SECTOR OF THE NIGERIAN OIL AND GAS INDUSTRY
Applicable to all Oil & Gas Operators GUIDELINES AND PROCEDURES FOR OBTAINING DPR APPROVAL FOR TRANSFER OF LICENCE, RIGHTS OR INTERESTS IN THE DOWNSTREAM SECTOR OF THE NIGERIAN OIL AND GAS INDUSTRY
Page 21 of 23
Applicable to all Oil & Gas Operators GUIDELINES AND PROCEDURES FOR OBTAINING DPR APPROVAL FOR TRANSFER OF LICENCE, RIGHTS OR INTERESTS IN THE DOWNSTREAM SECTOR OF THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0039 - 2020 Effective Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 17 b. The relative position of any existing pipeline or pipeline in an adjacent right of way within 100 meters. c. The regional topography of the area along the pipeline route within a distance of 100 meters on both sides should be indicated including any watercourses to be crossed. d. A hydraulic profile of the pipeline indicating the position of any pumping or booster stations. e. ancillary facilities along the pipeline or at its terminal ends such as compressor stations, manifolds, meter banks etc. v. Confirmation of availability of the following operational requirements: a. Approved operating manuals, maintenance manuals, mechanical catalogues, subject to appropriate modifications. b. Complete equipment reports on all critical equipment such as pressure safety valves and other safety critical elements. vi. Duly completed application for validation of the pipeline licences in the new operator’s name and evidence of payment of the prescribed Statutory Operating License fee made payable via the DPR online payment portal. vii. Evidence of payment annual fee for the preceding years for the pipeline or pipeline network. viii. Environmental Impact Assessment/Evaluation Studies Report/Approvals obtained by the former company/applicant for pipelines of 20km and above in length. ix. Copy of the current/last Oil or Gas Pipeline Licence, in the previous company’s name with the relevant attachments (topography map, shedule1&2), where applicable. x. Copy of the final integrity report of the pipeline of the 20th year of operation, where applicable.
CodesPDF20202020-0921