Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE OPERATIONS OF PETROLEUM REFINING FACILITIES Code: DPR GUIDE 0044 - 2021 Review Date: 3rd February 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE OPERATIONS OF PETROLEUM REFINING FACILITIES Code: DPR GUIDE 0044 - 2021 Review Date: 3rd February 2021
Page 21 of 38
Applicable to all Oil & Gas Operators GUIDELINES FOR THE OPERATIONS OF PETROLEUM REFINING FACILITIES Code: DPR GUIDE 0044 - 2021 Review Date: 3rd February 2021 This is a property of the Department of Petroleum Resources. All rights reserved 15 7. HANDLING AND BLENDING OF ADDITIVES AND CHEMICALS 1. Any additives and chemicals shall be handled strictly and in accordance with the up- to-date instructions as drawn up by the manufacturers and in compliance with the directives of the Department of Petroleum Resources, and a copy of each instructions shall be forwarded to the Department of Petroleum Resources. 2. The quantity of additives on any finished product shall not exceed that which is acceptable in the country and in any case shall not exceed that amount which the Department of Petroleum Resources may from time to time specify. 3. No additive or chemical shall be used in any refining facility without prior approval by the Department of Petroleum Resources at a prescribed fee. 4. If the result of any sample which an inspector of the Department of Petroleum Resources withdraws and analyses in the presence of an officer delegated by the manager shows that the approved maximum has been exceeded at any time, the manager shall be guilty of an offence under the Petroleum Refining Regulations and shall be liable to a fine not exceeding $100,000 USD. 5. Any refining facility found to be using any chemical not approved by the Department of Petroleum Resources contrary to paragraph (3) of this Regulation shall be liable to a fine not exceeding $100,000 USD. 8. INSPECTION AND TEST PROCEDURE In compliance with the provisions of Mineral Oil and Safety Regulations (MOSR), 1997 and its subsequent amendment(s), the Licensee shall notify the Department of Petroleum Resources of the completion of the refinery plant or any critical equipment which is due for testing, the notice shall be given not less than one month from the proposed date of commencement of the test(s).
CodesPDF20212021-0221