Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE OPERATIONS OF PETROLEUM REFINING FACILITIES Code: DPR GUIDE 0044 - 2021 Review Date: 3rd February 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE OPERATIONS OF PETROLEUM REFINING FACILITIES Code: DPR GUIDE 0044 - 2021 Review Date: 3rd February 2021
Page 24 of 38
Applicable to all Oil & Gas Operators GUIDELINES FOR THE OPERATIONS OF PETROLEUM REFINING FACILITIES Code: DPR GUIDE 0044 - 2021 Review Date: 3rd February 2021 This is a property of the Department of Petroleum Resources. All rights reserved 18 Process Piping 1. All process piping and its fittings in use in the refinery shall be periodically inspected visually and examined according to the procedure enumerated in the reference standard ANSI/ASME B 31, or accordance to code of design recommendation. 2. Where possible the tests shall be hydrostatic and shall be conducted in a manner that will ensure the protection of life, property, and the general environment of the piping system. 3. The pressure recording instruments to be used for the tests shall have a valid calibration certificate which should not be more than a year of issue and the chart record of the test shall be continuous and legible and all test results and any remedial action taken shall be submitted to the Department for approval before commissioning of the pipeline. The Accuracy of the pressure recorder shall be within two per-cent (2%) of its range. 4. All process piping system shall be inspected at least once every twenty-four months. Non-Pressure Vessels 1. The heat exchangers and other non-pressure vessel equipment within the refinery shall be inspected from time to time in accordance with code and standard acceptable to the Director/CEO Department of Petroleum Resources 2. If any fault is detected during the inspection, a detailed report of the inspection shall be forwarded to the Director/CEO Department of Petroleum Resources 3. Every heat exchanger and other non-pressure vessel/equipment shall be inspected at least once in thirty-six months. 8.2 ROTATING EQUIPMENT All rotation or reciprocating equipment shall be inspected and examined regularly in accordance with the reference codes and standards or codes of design recommendations.
CodesPDF20212021-0224