Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 10 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 4 Note: i. It is statutory for the Department to participate in the ROW inspection as provided on Appendix 4: Statutory Compliance Checklist for Pipelines. ii. The requirements of National Data Repository (NDR) Regulations, 2020, shall apply for the charting of the pipeline per stand sheet and any other data that will be released from the Repository. 2.2.1 Survey Activity for Pipelines In reviewing the application for PTS, the DPR shall seek consents and no objections from other agencies such as Ministry of Lands, NPA, NIWA, Railway etc. as applicable, depending on the interference by the proposed pipeline. Following the issuance of PTS, the proponent shall within validity of the permit proceed with activities permitted in the oil pipeline act for the purpose of establishing the route for the proposed pipeline. In line with p art 6 of the Oil Pipeline Act, the proponent shall ensure the following in the selection of ROW: i. Any other consent required for the PTS which were not previously obtained are duly secured. For this purpose, a minimum of 14 days’ notice shall be given. Special attention shall be given to venerated lands as described in the Oil Pipeline Act. ii. It takes reasonable steps to avoid unnecessary damage to the environment. iii. Compensations are made to owners and occupiers of any property for any damage done iv. Any dispute that may arise shall be settled in line with the Part 4 of the Oil Pipeline Act v. The ROW selected allows access for construction, operations, inspection, maintenance, testing or in an emergency. Note: The DPR shall be notified of any change of route/variations within the validity of a PTS.
CodesPDF20212021-1010