Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 16 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 10 2.5.2 Application for Conceptual Design / Front-End Engineering Design Application for approval of conceptual design/FEED shall be forwarded to the Department of Petroleum Resources with the following deliverables: i. Basic design concept/FEED adopted for the development of the proposed pipeline system ii. Scope of work for the proposed pipeline development project iii. The design basis of the pipeline system iv. The approved technical specification for the proposed pipeline development project v. A preliminary plan and profile for the proposed pipeline system vi. A copy of the approved FDP associated with the pipeline project where applicable vii. A copy of Preliminary Environmental Impact Assessment approval for pipeline applications of 20km and above. viii. Basic concept of leak detection and general pipeline integrity monitoring. ix. A copy of the planned organogram of the project execution / management team. x. A copy of the planned local content program for the proposed project. xi. Evidence of Payment of N 500,000:00 only made payable to the Department of Petroleum Resources as processing fees. xii. Copy of the preliminary pipeline development project schedule in either level 0 or 1 xiii. A copy of the preliminary project cost and a statement on the planned funding method. 2.5.3 Approval of Conceptual Design / Front-End Engineering Design Company shall be requested to make a formal presentation of its conceptual design to the Department after the receipt of above deliverables. The Department shall thereafter communicate approval of conceptual design for the proposed pipeline development project. Where such submission/presentation is not adequate, the Department shall notify the company not more than four (4) weeks from the date of the presentation why such approval shall not be granted.
CodesPDF20212021-1016