Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 17 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 11 An approved conceptual design/FEED shall form the basis for the development of the proposed pipeline system. Where a variation from the approved conceptual design/FEED is considered, necessary such deviations shall be communicated to the Department. Note: Where line pipes shall be procured as Long Lead Items (LLI), it shall be necessary for the licencee to notify the Department of all proposed manufacturing Inspection programs at-least six weeks prior to commencement of pipe mill activities and make arrangements for the full participation of the DPR representatives. Site witness sheet signed by a representative of the Department and other parties be forwarded. 2.6 Detailed Engineering Design All pipeline development shall duly obtain an approval of the detailed engineering design prior to commencement of procurement, construction, and installation activities. Detailed Engineering include activities required to develop an approved conceptual design into an executable level for provision of a pipeline system. Nominated technical officers of the Department shall continue to provide regulatory guidance throughout the entire project execution. Note: For Facility Development Projects with pipelines as part of the SOW, Pipeline Approvals and Licences process depicted above shall apply to the pipeline SOW. 2.6.1 Application for Detailed Engineering Application for approval of detailed design shall be forwarded to the Department of Petroleum Resources with the following deliverables: i. Approved for construction PFS with fluid flow calculation notes and / or material balances (where available) of pipeline system ii. Approved for construction P&ID for the pipeline system iii. Schematic Plan and profile of the pipeline system showing manner of crossings, pipeline marker positions, Pipeline grade, cathodic protection, line sectionalisation valve stations, etc. iv. An arc GIS spatial grid of the pipeline system with reference to Minna Datum or approved geodetic format. v. A copy of the QA /QC approved for the project execution
CodesPDF20212021-1017