Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 20 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 14 2.7.1 Factory Acceptance Tests & Pipeline Mill Inspections As applicable, Factory Acceptance Test (FAT) shall be carried out to evaluate design and operating specifications and assess any discrepancies and non-conformities of the pipeline systems and ancillary equipment prior to the assembly process. The FATs shall be witnessed by nominated SMEs from DPR. Deviations or abnormalities observed during testing shall be documented and corrected prior to shipment. Furthermore, where line pipes shall be procured as Long Lead Items (LLI), the full participation of the DPR representatives shall be mandatory for Pipeline Mill productions and Inspections. The proponent shall notify the DPR of all proposed manufacturing Inspection programs at-least six weeks prior to commencement of pipe mill activities. Site witness sheet signed by a representative of the Department and other parties shall be forwarded. Note: Such inspection may require the use of Certified Verification Agents as the DPR may deem fit. 2.8 Pre-Commissioning Hydrocarbon shall not be introduced into any newly constructed or upgraded pipeline system without the pre-commissioning exercise carried out and witnessed by representatives of the Department. The pre-commissioning are series of approved activities required for the purpose of establishing the availability, functionality and reliability of a pipeline system prior to introducing hydrocarbon for normal transportation operation An application for the exercise alongside the pre-commissioning schedules and procedures shall be submitted to the Department at-least four (4) weeks prior to the commencement of the exercise. 2.9 Commissioning / Introduction of Hydrocarbon Hydrocarbon shall not be introduced into any newly constructed or upgraded pipeline system without the approval for commissioning by the Department. Commissioning includes series of activities leading to the introduction of hydrocarbon fluid into a pipeline system that has been successfully pre-commissioned. Commissioning approval shall be granted to any pipeline system that has met the following conditions:
CodesPDF20212021-1020