Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 21 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 15 i. An application has been forwarded for grant of commissioning/introduction of hydrocarbon approval ii. A satisfactory pre-commissioning report iii. Completion of a post-construction risk assessment workshop with participation of the Department iv. A completed emergency response exercise report v. Payment of N 500,000:00 made payable to the Department of Petroleum Resources as processing fees. 2.10 Licence To Operate Pipelines An application for Licence to Operate for a pipeline shall be submitted to the Department after the commissioning/introduction activities and shall be renewed annually. In this regard, the provisions of Part III of the Oil Pipelines Act and Section 6 subsection 2(e) of the Petroleum (Drilling and Production) (Amendment) Regulations, 2019 shall be followed in making such applications, in addition the following requirements shall be fulfilled: a. A statement indicating the service that the pipeline will render b. The characteristics of the fluid to be conveyed through the pipeline. c. The schematic plan of the pipeline showing the following: i. The route of the pipeline marked in red, with sections and quarter sections shown. ii. The location of each point at which there is a change in any of the following parameters: (a) Outside or nominal diameter of the pipeline (b) Wall thickness of the line pipe material (c) Type and Grade of line pipe. (d) Designed maximum operating pressure. (e) Direction of fluid flow along the pipeline. d. The schematic plan of the pipeline showing the following details: i. Location and operating details of corrosion prevention devices, main line valves and any emergency shut down devices. ii. Pig launching and receiving points and any tie-in points with operating details.
CodesPDF20212021-1021