Applicable to all Oil & Gas Operators  
GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND 
MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA  
Code: DPR Guide 0027 – 2021 
 
Effective Date: 14th October 2021 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
18 
iv. 
No used fitting of an existing pipeline shall be reused on a new pipeline 
without its original specification being identified and confirmed to be 
capable to perform the new service 
v. 
Threaded joints at both internal and external portions shall all be of the 
tapered line pipeline thread type conforming with API SPEC 5B or NPT in 
accordance with ASME B1.20.1-2013 
vi. 
The least nominal wall thickness of the threaded portion of the pipe shall 
not be less than the value specified in ASME B36.10M-2018 
vii. 
All threaded joints shall be on sections of the pipeline above ground. 
viii. 
If two or more pipelines are to be connected in manner that one will 
operate at a pressure higher than the other, they shall be so designed that 
the pipeline system operating at the lower pressure shall not be subjected 
to any pressure greater than its licensed operating pressure. 
ix. 
All pipe fittings, valves and equipment connected to the pipeline shall have 
manufacturers’ ratings which are equal to or greater than the proposed 
maximum operating pressure of the pipeline. 
d. All pipelines shall have Remote Monitoring System Remote Monitoring systems 
installed on them. 
Note: Other internationally recognised standards approved by the Department shall be 
accepted. 
3.3 Minimum Construction Requirements 
This procedure shall apply to new pipelines construction and replacements of existing 
pipelines. The pipeline construction shall generally follow the steps outlined in Chapter V 
of the standard ASME B 31.4-2019 or its subsequent revisions.  The construction code shall 
be guided by the following: 
i. 
The licencee shall inform the Department prior to the start of construction. 
Nominated technical officers of the Department shall continue to provide 
regulatory guidance. 
ii. 
All metallic pipeline material to be buried shall be coated with any of the 
following systems – coal-tar enamel, Asphalt enamel, polyethylene tape, epoxy,