Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 25 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 19 asphalt mastic, urethane or other material specially approved by the Department for specific reasons. iii. All surface pipelines shall be painted, raised and maintained above ground on permanent supports. iv. All pipeline construction shall be carried out in a manner that will minimize disturbance to the environment. v. Special precautions shall be taken to protect the pipeline from washouts, unstable soil, landslides, or any other hazards that may cause the pipeline to move or be subjected to abnormal loads. vi. All pipelines welding shall be in accordance with the provisions of API STD 1104- 2013 while welding inspection shall be by non-destructive method preferably using Radiographic method contained in API STD 1104-2013 or its later editions. 3.3.1 Minimum Requirements for Pipeline Burial a. Ditching for the pipeline shall follow good pipeline practice and consideration for public safety as provided for in the Standard API RP1102-(R2017) shall be followed. b. Minimum soil coverage of pipelines shall be as follows: i. Dry land – 1.0 meter. ii. River crossings and riverbeds – 1 meter. iii. Drainage ditches, Railroad and Highway Crossing – 1.5 metres iv. Rocky Areas – 0.9 metres v. Swamp – 1.0 meter vi. Shipping Channels – 2.0 metres c. At railroad and highway crossings, in addition to the specific requirement of the relevant Government Agency responsible for these infrastructures, the following precautions shall be taken: i. Installations of carrier pipe or casing shall be in accordance with API RP1102- (R2017). ii. The casing shall be insulated from its carrier pipe support and shall extend to both sides of the railroad or highway. In the alternative the crossing could be of a thicker wall line pipe covered with compacted full and protective reinforced concrete slab.
CodesPDF20212021-1025