Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 27 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 21 Note: Six months after the completion of construction, the licencee shall submit two copies of the as built plan of the pipeline on the same scale as that of the plan submitted along with the pipeline licence. 3.4 Procedure For Inspection and Testing. The Licencee shall notify the Department of the completion of construction of the pipeline or any sections of it which is due for testing giving notice of not less than one month from the date of commencement of such tests. Inspection shall be guided by the following: The pipeline material and construction shall be inspected visually and examined radio graphically according to the procedure enumerated in Chapter VI of the reference standard ASME B 31.4 – 2019 and internationally recognised standards approved by DPR. a. All tests shall generally be hydrostatic and be conducted in a manner that will ensure the protection of life, property, and the general environment of the pipeline. b. The entire length of the pipeline shall be tested to the designed rated pressure while any in-line pressure vessel or prefabricated manifold on the pipeline shall be tested to the manufacturer’s specifications in accordance with the Mineral Oils Safety Regulations (MOSR). c. The pressure recording instruments to be used for the tests shall have a valid calibration certificate which should not be more than a year of issue and the chart record of the test shall be continuous and legible and all test results and any remedial action taken shall be submitted to the Department for approval before commissioning of the pipeline. The Accuracy of the pressure recorder shall be within two per-cent (2%) of its range. d. Unless otherwise permitted by the DPR, pressure test duration shall not be less than four hours of continuous test both for leaks and material failures. Buried pipeline of up to 100 meters in length and all surface running pipelines could be tested for less periods but not lower than (1) hour. e. The general guiding rule for environmental protection shall be as follows: i. Where the test pressure shall result in a hoop stress greater than 75 percent of specified minimum yield strength of the pipeline based on the nominal
CodesPDF20212021-1027