Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 32 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 26 specified construction types of pipelines in the proximity of main roads and railroads and the mode of their crossing shall be complied with. d. The minimum depth of burial shall be as specified in Section 3.3.1 but where these minimum depths could not be achieved, the pipeline at these points shall be encased, bridged, or specially reinforced to withstand any anticipated external load. e. There shall be a minimum clearance of 0.5 meter between the pipeline and any other underground structure not connected with it. f. It shall be mandatory for all buried pipelines to be protected against corrosion where any pipeline is to transport corrosive or toxic gas, the following shall be ensured: i. Design parameter shall be such that the gas pressure at any time in the pipeline shall not result in a hoop stress greater than 60 percent of the specified minimum yield strength of the pipeline material based on the nominal wall thickness. ii. Block valves and check valves shall be so located as to prevent the escape of the corrosive or toxic gas into the atmosphere in the event of a pipeline failure. g. The design, installation and maintenance of the associated corrosion control system of the pipeline shall be in line with section 3.5, in conformance with to the provisions of NACE SP0169-2013 and other internationally recognised standards approved by DPR. 4.2.2 Requirements for Inspection and Testing of Gas Pipelines i. Inspection of pipeline construction materials and its appurtenances, welding, ditching, stringing and the general installation shall follow the procedure outlined in chapter IV of the ASME B31.8-2018 and other internationally recognised standards approved by DPR. ii. All gas pipelines laid in farmlands, virgin areas and sparingly populated areas shall be tested with water up to a minimum pressure of 125 percent of their maximum operating pressure or with air up to 110 percent of their maximum operating
CodesPDF20212021-1032