Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 35 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 29 B. Pipeline i. Hydrostatic strength (20 deg centigrade, 100h, 80 deg c, 165h, 80 deg c,1000h) ii. Elongation at break iii. Resistance to slow crack growth e</= 5mm (Cone test) iv. Resistance to slow crack growth e> 5mm (Notch test) v. Resistance to rapid crack propagation (critical pressure, Pc) vi. Oxidation induction time (Thermal stability) vii. Melt mass flowrate (MFR) viii. Longitudinal reversion C. Valves i. Resistance to weathering ii. Leak-tightness of seat and packing iii. Actuation mechanism resistance iv. Resistance to bending between supports v. Thermal cycling resistance dn>63mm vi. Leak-tightness under bending with thermal cycling, dn</= 63mm vii. Leak-tightness under tensile loading viii. Leak-tightness under and after bending applied to the operating mechanism 5. FLOWLINE, PIPELINE & RISER SYSTEMS FOR OFFSHORE OPERATIONS 5.1 Basic Statutory Approvals Basic statutory pipeline approvals applicable to offshore flowline, pipelines and riser systems shall as a minimum be as given in section 3. 5.2 Design Criteria In addition to the general requirements of Sections 3 & 4 of this guideline, proper design consideration shall be given to establish acceptable / tolerable limits for the design of any Flowline and Riser System in the Nigerian offshore and deep offshore locations. API STD 2RD and API RP1111-2015 shall form the additional basic reference codes / standards for the design of these systems. Where model studies will be carried out for any of the systems associated with the FLRs, for the purpose of guaranteeing any design / technological procedure, the company shall notify the Department of Petroleum Resources at least four (4) weeks prior to the conduct
CodesPDF20212021-1035