Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 38 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 32 c. Care shall be taken to ensure that at no time should the maximum steady state operating pressure and static condition exceed either the internal design pressure or the pressure ratings of components used whichever is less. d. Pressure surges or any momentary pressure variations shall not exceed 10 percent of the operating pressure limits. e. Pressure Relief Devices shall be inspected and re-certified once in every twenty- four (24) months in the presence of DPR representatives and with the report of such tests lodged with the nearest office of the Department. f. All Pressure Relief Devices shall be activated after installation/maintenance to ensure that they function properly. 6.3.2 Pipeline Route The Pipeline route shall be operated and maintained in compliance with the Oil Pipeline Act and in line with Internationally recognised standards. Additionally, the following shall be carried out at the minimum: i. Pipeline markers at crossings shall indicate the location of the line and the name of the operating company. ii. The right of way shall be maintained so as to have a clear visibility and give reasonable access to maintenance crews. iii. Clear access shall be maintained to valve locations and ditches shall be protected against washout of the line. iv. The right of way shall be regularly patrolled/monitored for prompt detection of any line break, encroachment or any other development that may endanger the safety of personnel, environment, and pipeline. Where there is such development, the Operator shall promptly take necessary actions to prevent escalation of hazard and report the development to the DPR within 24 hours. v. All under water crossing shall be periodically inspected but not longer than once in two years to ensure that there is sufficient cover for the pipeline and that the safety of the line at crossings is not endangered in any way. 6.3.3 Offshore Pipelines Offshore Pipelines shall be operated in line with internationally recognised standards. The operator shall ensure that for offshore pipelines connected to platform risers, the riser
CodesPDF20212021-1038