Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 39 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 33 installations shall be visually inspected annually for physical damage or corrosion in the splash zone and above. Records of such inspections shall be kept on site and made available on demand. 6.3.4 Gas Pipelines The Gas Pipelines shall be operated and maintained in line with internationally recognised standards. Additionally, the following shall apply at the minimum: i. Any gas pipeline that will be inactive for more than six months after construction/operation shall be preserved with inert gas or nitrogen. ii. Where a pipeline will be inactive for more than one year, such pipeline shall be pressure tested and certified by officials of the Department of Petroleum Resources before being put into use again. iii. Gas pipeline systems shall be purged with water, air or inert gas before undertaking any repairs. iv. The environment of the repair site for gas pipelines shall be constantly monitored with gas detecting device to ensure adequate safety. 6.3.5 FLR Operation & Maintenance The approved operation and maintenance schedules shall be appropriately implemented during the operational life span of the FLR systems. Failure to fully implement the approved O&M programs shall become an offence punishable under the applicable Petroleum Regulations and Act. 6.3.6 Monitoring of Cathodic Protection Systems Cathodic protection facilities shall always be maintained in serviceable condition. The following shall be ensured at the minimum: i. Cathodic protection facilities shall be electrically tested and inspected once a year with appropriate corrective measures taken where such inspections reveal any weakness in the system. ii. A report of such inspections shall be lodged with the Department at the completion of such exercise.
CodesPDF20212021-1039