Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 42 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 36 7. DECOMMISSIONING AND RESUMPTION OF OPERATION FOR PIPELINE SYSTEMS 7.1 Decommissioning of Operation of Pipeline Systems The Licencee shall apply to the Department giving three months’ notice of its intention to discontinue with the operation of the pipeline system or ancillary facilities. Such applications shall be accompanied with the following: i. The reasons for the discontinuation of the operation of the pipeline system ii. A plan of the entire pipeline or part thereof in which the operations is to be discontinued shown in green colour. iii. The proposed method of discontinuing operations. iv. Payment of N500,000:00 made payable to the Department of Petroleum Resources as processing fees. 7.1.1 Procedure for Decommissioning of Operations Apart from the conditions that may be specified when granting discontinuation approval, the pipeline to be discontinued with shall be i. Disconnected from all other facilities like other pipelines, meter stations, ancillary facilities and other appurtenances. ii. Purged of all Petroleum Liquid or Gas with water or an inert material iii. Capped at both ends with moisture resistant materials. 7.2 Abandonment and Removal of Pipelines Where the Pipeline is to be decommissioned, abandoned and/or removed, the licencee shall engage the Department in an abandonment concept selection workshop. The following shall apply: i. All the steps outlined in Section 7.1 above shall be followed in cases where the pipeline is to be completely abandoned. ii. The right of way of abandoned pipelines shall continue to be maintained and clearly identified for as long as the pipeline remains in place. iii. In cases where the pipeline is to be removed, the Licencee shall furnish the Department with the proposed work programme for its removal. Also, the Licencee shall restore into perfect condition the right of way of the pipeline and other disturbed land areas in the neighbourhood after its removal.
CodesPDF20212021-1042