Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 43 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 37 iv. The provision of EGASPIN and other Guidelines issued by the Department. 7.3 Resumption of Operation on Decommissioned Pipeline An application shall be made to the Department of Petroleum Resources for approval to resume operations in a mothballed pipeline system. Such applicants shall i. State reasons for the resumption of operation and ii. The proposed method to be used in reactivating the pipeline. iii. All such pipelines shall be tested under the proposed operating conditions of the pipeline after reactivation. 8. NON-COMPLIANCE These Guidelines provide the requirements for Design, Construction, Operations and Maintenance of Oil and Gas Pipeline Systems in Nigeria. Non-compliance with the provisions of these Guidelines by any pipeline operator / owner shall be deemed as violations to relevant sections of the Oil pipeline Act, Oil and Gas Pipeline Regulations 1995, Petroleum (Drilling and Production) (Amendment) Regulations 2019. These violations may result in applicable consequence management, including, but not limited to, fines, penalties, suspension, and/or revocation of licence and permits. Appendix 2 summarises penalties prescribed for pipelines violations. 9. APPENDICES 9.1 Appendix 1 - Summary of Fees for Pipeline Licence Process Table 9-1 Summary of Fees for Pipeline Licence Process S/N FEE DESCRIPTION AMOUNT 1. PTS Application Fee NGN 20:00 2. PTS Grant Fee NGN 50:00 3. PTS Processing Fee NGN 500,000:00 4. OPLL Application Fee NGN 50:00 5. OPLL Grant Fee NGN 200:00 6. OPLL Processing Fee NGN 500,000:00 7. Transfer of OPLL Processing fee NGN 500,000:00 8. OPLL Annual Rental Fee NGN 20:00/mile
CodesPDF20212021-1043