Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021

Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021

Page 44 of 48

Open the PDF at page 44

 
 
 
 
Applicable to all Oil & Gas Operators  
GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND 
MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA  
Code: DPR Guide 0027 – 2021 
 
Effective Date: 14th October 2021 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
38 
(NGN 12:50/km)  
or NGN 200:00 minimum 
9.  
Licence To Operate Fee 
USD 10,000:00 
10.  
Renewal of Licence To Operate Fee 
USD 10,000:00/annum 
11.  
Conceptual Design/Feed Approval Fee 
NGN 500,000:00 
12.  
Re-Validation of Conceptual Design/Feed Processing Fee 
NGN 250,000:00 
13.  
Detailed Engineering Design Approval Fee 
NGN 500,000:00 
14.  
Commissioning / Approval to Introduce Hydrocarbon 
Processing Fee 
NGN 500,000:00 
15.  
OPLL Application Fee for a Restriction Order 
NGN 100:00 
16.  
Grant Fee of a Restriction Order 
≤ NGN 400:00 
17.  
Change of Service Processing Fee 
NGN 500,000:00 
18.  
Decommissioning Processing Fee 
NGN 500,000:00 
 
9.2 
Appendix 2- Summary of Penalties for Non- Compliance 
Table 9-2 Summary of Penalties for Non- Compliance 
S/N 
FINE DESCRIPTION 
AMOUNT 
1. 
 
Operating Pipeline Without a Valid LTO 
USD 250,000:00 
2.  
Decommissioning a Pipeline Without Approval 
USD 250,000:00 
In addition to the above fines, non-compliance to the provisions of these guidelines may 
attract other penalties such as withdrawal or suspension of permits and licences, 
prosecution and special fines as may be determined by the Department of Petroleum 
Resources.