Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 44 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 38 (NGN 12:50/km) or NGN 200:00 minimum 9. Licence To Operate Fee USD 10,000:00 10. Renewal of Licence To Operate Fee USD 10,000:00/annum 11. Conceptual Design/Feed Approval Fee NGN 500,000:00 12. Re-Validation of Conceptual Design/Feed Processing Fee NGN 250,000:00 13. Detailed Engineering Design Approval Fee NGN 500,000:00 14. Commissioning / Approval to Introduce Hydrocarbon Processing Fee NGN 500,000:00 15. OPLL Application Fee for a Restriction Order NGN 100:00 16. Grant Fee of a Restriction Order ≤ NGN 400:00 17. Change of Service Processing Fee NGN 500,000:00 18. Decommissioning Processing Fee NGN 500,000:00 9.2 Appendix 2- Summary of Penalties for Non- Compliance Table 9-2 Summary of Penalties for Non- Compliance S/N FINE DESCRIPTION AMOUNT 1. Operating Pipeline Without a Valid LTO USD 250,000:00 2. Decommissioning a Pipeline Without Approval USD 250,000:00 In addition to the above fines, non-compliance to the provisions of these guidelines may attract other penalties such as withdrawal or suspension of permits and licences, prosecution and special fines as may be determined by the Department of Petroleum Resources.
CodesPDF20212021-1044