Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 46 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 40 19. Construction of Pipeline Determined by DPR & proponent Proponent 20. Preparation and submission of Pre-commissioning application Determined by proponent Proponent 21. Pre-commissioning Exercise Determined by proponent Proponent 22. Preparation and submission of Commissioning/Approval To Introduce Hydrocarbon application Determined by proponent Proponent 23. Issuance of Approval to Introduce Hydrocarbon 2 weeks DPR 24. Preparation and submission of LTO application Determined by proponent Proponent 25. Review & Issuance of LTO 2 Weeks DPR 9.4 Appendix 4: Statutory Compliance Checklist Table 9-4 Statutory Compliance Checklist S/No Statutory Compliance Plan DPR Activity 1. Permit to Survey Pipeline R.O.W. Inspection of proposed ROW and Permit to Survey. DPR shall seek the consent of 3rd party agencies (Ministry of Lands, NPA, NIWA, Railway e.t.c. depending on the interference by the proposed pipeline). 2. Conceptual Design Participation and Approval 3. Design Safety Case (Basic) Approval 4. Detailed Design Participation and Approval 5. Environmental Impact Assessment (EIA) Approval 6. Environmental Management Plan (EMP) Endorsement 7. Technical, Safety and Engineering Reviews Participation 8. Manufacturing Inspection Plan (MIP) / Line Pipe Mill Certification Witness and endorse In-factory manufacturing QA/QC processes 9. Factory Acceptance Tests (FAT) / Inspection & Test Plans (ITPS) Witness and endorse 10. Pipeline O&M Strategy Approval & Monitoring 11. OPLL Grant of Licence. DPR shall seek the consent of 3rd party agencies (Ministry of Lands, NPA, NIWA, Railway e.t.c.
CodesPDF20212021-1046