Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021
Page 8 of 48
Applicable to all Oil & Gas Operators GUIDELINES FOR THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINE SYSTEMS IN NIGERIA Code: DPR Guide 0027 – 2021 Effective Date: 14th October 2021 This is a property of the Department of Petroleum Resources. All rights reserved 2 IV. PIPELINE SYSTEM- All parts of those physical facilities comprising a particular pipeline through which hydrocarbon resource flows, including pipe, valves, and other appurtenances attached to the pipeline such as, pump or compressor stations, regulating and metering stations, block valve stations, electrical equipment stations for Cathodic Protection etc. 2. BASIC STATUTORY PIPELINE APPROVALS AND LICENCES 2.1 Overview of Pipeline Approvals and Licences All applications for approvals and licences for the design, construction and operation of any pipeline shall be made to the Department of Petroleum Resources with evidence of payment of prescribed fees, as applicable. The applications steps are depicted below: 2.1.1 Applications Relating to Pipeline Route and Construction The application steps are as follows i. Permit to Survey ii. Licence to Construct/OPLL 2.1.2 Application Relating to Engineering of Pipeline System For the engineering processes of the pipeline system, the application/approval steps are as follows: i. Conceptual Design / Front-End Engineering Design ii. Detailed Engineering Design iii. Notification on commencement of Construction iv. Pre-commissioning v. Introduction of Hydrocarbon / Commissioning. vi. Licence to Operate the Pipeline. Note this licence to operate for pipeline will be renewed annually when the pipeline is in operation Note: i. The minimum design and construction requirements are contained Section 3 and Section 4 of these Guidelines for oil and gas pipelines respectively. ii. For Facility Development Projects with pipelines as part of the SOW, Pipeline Approvals and Licences process depicted above shall apply to the pipeline SOW.
CodesPDF20212021-108