Library / GUIDELINES FOR THE ESTABLISHMENT OF A NATURAL GAS PLANT FACILITY IN NIGERIA. DPR 2006
GUIDELINES FOR THE ESTABLISHMENT OF A NATURAL GAS PLANT FACILITY IN NIGERIA. DPR 2006
Page 10 of 13
10 b) The operator shall prepare and submit an annual program of activity in the form of a presentation to the Director of Petroleum Resources at the beginning of each calendar year. 3.3 MAINTENANCE This comprises routine, preventive scheduled and turn-around maintenance. a) The gas plant facilities shall be periodically examined for corrosion detection and corrosion protection systems and devices installed shall be regularly checked to ensure effective performance. All these anti-corrosion performance monitoring shall be carried out in accordance with current NACE (National Association of Corrosion Engineers) Standards and procedures. b) All turn-around maintenance (TAM) schedules shall be duly submitted to the Director of Petroleum Resources at least three months prior to its commencement and thereafter, monthly progress report of the maintenance shall be rendered until completion for monitoring purposes only. 3.4 PLANT MODIFICATION Any proposed modification or enlargement of existing gas plant and facilities shall be communicated to the Department and must be approved in accordance with the provisions of Regulation 3 of the Petroleum Refining Regulations, 1974 and its subsequent revisions before being carried out. 3.5 PLANT RELOCATION In the case of a request to relocate an existing plant to Nigeria, the applicant shall provide the following information to the Director of Petroleum Resources. a) Reason for the plant relocation. b) Operational history of the plant including years of operation. c) Types of feedstock the relocated gas plant units will process. d) Proposed Process Flow Diagram. e) Layout for the relocated gas plant f) List of process units/packaged units to be re-designed and new gas plant configuration. g) List of equipment to be re-engineered. h) Land requirement for relocation i) Feedstock supply and products evacuation scheme. j) Electrical single line diagrams. k) Process and Instrumentation Diagrams (P&ID’s) of the process units and utilities l) Safety, Process and maintenance manuals. m) HAZOP review report of the re-designed and re-engineered gas plant. n) Environmental Impact Assessment report. o) The design parameter and the As-built drawings of the entire plant, offsite and utilities. p) Current technical status of the plant certified from a comprehensive technical audit carried out by an internationally reputable inspection agency.
GuidelinesPDF10