Library / GUIDELINES FOR THE ESTABLISHMENT OF A NATURAL GAS PLANT FACILITY IN NIGERIA. DPR 2006
GUIDELINES FOR THE ESTABLISHMENT OF A NATURAL GAS PLANT FACILITY IN NIGERIA. DPR 2006
Page 3 of 13
3 GUIDELINES FOR THE ESTABLISHMENT OF A NATURAL GAS PLANT FACILITY IN NIGERIA SECTION 1 1.1 SCOPE These guidelines are issued pursuant to Regulation (2) and (3) of the Petroleum Refining Regulations, 1974 and Petroleum Regulations 1969 as amended, any regulations that may come in force and shall apply to the construction of a Gas treating/conditioning plant, Liquefied Natural Gas (LNG) and Natural Gas Liquids (NGL) Plants, Petrochemical Plant, Fertilizer Plant (in which gas is the feedstock) and Gas Treating Facility. Application for approval to establish a gas plant facility or any other process plant shall be made in the manner described in (1.2) below and in the form schedule annexed to these guidelines 1.2 APPROVAL PROCESS FOR THE DESIGN, CONSTRUCTION, COMMISSIONING AND OPERATION OF A GAS PLANT FACILITY The approval process described hereunder is designed to ensure that the applicant for licence to establish a gas plant facility understands the industry, the technical and economic implications of the project, the sociological and environmental impact of the plant, and maintenance provisions required to protect the health of the operating staff and safety of plant. It is designed to prevent avoidable waste of resources by ensuring at each stage that the applicant understands the statutory requirements of each phase of the project. Consequently, the approval shall be given in the following sequential stages, culminating in the grant of a license to operate the plant 1.2.1 LICENSE TO ESTABLISH A GAS PLANT FACILTY CONCEPTUAL STUDY AND BASIC DESIGN This approval stage is to confirm general feasibility of the proposed project. The following submissions shall be made to the Director, Department of Petroleum Resources, 7 Kofo Abayomi Street, Victoria Island Lagos. a) Conceptual Study: i) Project Concept ii) Marketing study, indicating whether domestic, export, or if both markets are being targeted. iii) Basis of Design iv) Feedstock flow assurance report v) Field Development Plant (FDP) approval vi) Product volume and recovery. vii) Feedstock composition and PVT analysis viii) Proposed site for the project and coordinates. ix) Proposed feedstock supply and product evacuation scheme.
GuidelinesPDF3