Library / GUIDELINES FOR THE ESTABLISHMENT OF A NATURAL GAS PLANT FACILITY IN NIGERIA. DPR 2006
GUIDELINES FOR THE ESTABLISHMENT OF A NATURAL GAS PLANT FACILITY IN NIGERIA. DPR 2006
Page 9 of 13
9 SECTION 3 3.0 LICENSE TO OPERATE GAS PLANT FACILTY 3.1 COMMISSIONING AND OPERATING LICENCE Upon mechanical completion of the plant, a pre-commissioning inspection of the facility shall be carried out by the Department prior to the issuance of operating licence. The following shall be the pre-requisites to quality: 1) A qualified gas manager is appointed and his appointment is notified in writing to the Director of Petroleum Resources. 2) Complete equipment reports on all critical equipment such as pressure vessels, heat exchangers, fractionation column, compressors, drivers, rotating equipment and storage tanks. 3) Completion of all metering equipment and systems to approved standards. 4) Availability of adequate spare parts, chemicals, catalysts, lubes, greases and other operating consumable materials in the warehouse appropriately codified and organized. 5) Availability of commissioning spare parts, apart from operating spare parts, all properly coded and arranged in the warehouse. 6) Approved operating manuals, maintenance manuals, mechanical catalogues, would have all been supplied, subject to appropriate modifications after commissioning. 7) Approved operating and maintenance organization and availability of trained manpower in sufficient strength. 8) Functional and effective fire prevention and fighting organization already in existence. 9) Functional and effective Safety enforcement Organization and Policies already in existence. 10) All approved engineering drawings in agreed numbers of copies have been supplied by the contractor, subject to modifications to reflect changes during construction. 11) The quality control laboratory is completed and functional. 12) A well-staffed and equipped First Aid Clinic is in place. 13) All other provisions, which are reasonably required to facilitate effective commissioning of the plant, have been made. 14) Confirmation that all-environmental protection standards during design have been met. 15) Payment of prescribed license fees. 3.2 PLANT OPERATION a) The gas plant facility shall be operated in compliance with the provisions of the Petroleum Refining Regulations, 1974 and any regulations that may come in force.
GuidelinesPDF9