Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Page 10 of 20
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020 Revision Date: 1st August 2020 This is a property of the Department of Petroleum Resources. All rights reserved 6 iii. Risk acceptance criteria iv. Factors used to determine risk v. Assumptions made during assessment vi. Risk assessment results (unmitigated risk level) vii. Follow-up mitigation strategy viii. Mitigated risk level In addition to the above demonstration, an Operator wishing to implement an RBI program must have the resources and structure to implement and sustain the program. This will include the continuous involvement of experienced corrosion, materials, inspection, safety, maintenance and process engineers/technologist in the process. The DPR shall be informed if an Operator intends to alter the acceptance criteria and safety objectives for risks in the activities, failing which the DPR may choose to invalidate the approval process. 3.3.1 Safety Objectives Operators implementing RBI methodology and risk assessment shall define safety objectives for their activities. To ensure that the planning, maintaining and enhancement of safety in the activities become a dynamic and forward-looking process, the Operator is required to express his safety objective as an ideal safety level. The safety objectives shall reflect the requirement of all applicable Regulations with regards to safety of people, assets, the environment and cost. Depending on the activity, the Operator's safety objectives may be expressed as long-term and short-term objectives and shall be used to determine preventive safety measures based on knowledge obtained through a risk analysis. This shall be used for the enhancement of safety in the activities and shall form the basis for revision of the Operator’s acceptance criteria.
CodesPDF20202020-0810