Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Page 12 of 20
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020 Revision Date: 1st August 2020 This is a property of the Department of Petroleum Resources. All rights reserved 8 principle, a comprehensive RBI assessment workshop shall be conducted for that particular facility. Multiple facilities may be assessed in a given workshop by an operator subject to concurrence by the Department. The assessment shall cover ALL the equipment/devices in the facility under the scope for which an approval is sought. Baseline inspections shall be conducted and documented for new facilities or facilities without appropriate inspection data, prior to the commencement of RBI assessment. The following minimum requirement must be met for a risk analysis to be accepted. i. The risk analysis process must be clearly documented in a written procedure. This procedure must be a referenced and controlled document under Owner- User quality manual. ii. Detailed definition of the procedure must be given throughout the risk analysis process. The procedure must detail how failure mechanisms are defined for each equipment and how likelihood and consequences of failure are established, and how this can be used to determine level and inspection frequencies. The operator shall subject risk assessment procedure for audit and review by the DPR whenever there are major changes or every five (5) years, whichever comes first. 3.4.1 Pre-Workshop Information At the minimum, the following data/information and documentation of all equipment/devices to be assessed shall be available prior to the commencement of any RBI assessment: i. Equipment technical and engineering specification(s) ii. Equipment identification information (equipment description, serial number, tag number, etc.) iii. As-built/Up-to-date Piping & Instrumentation Diagram, Process Flow iv. Diagram, etc. for the facility
CodesPDF20202020-0812