Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Page 13 of 20
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020 Revision Date: 1st August 2020 This is a property of the Department of Petroleum Resources. All rights reserved 9 v. Equipment inspection history (Baseline inspection for new facility) vi. Process Fluid description and characteristics vii. Observed external and surrounding(s) condition of the facility 3.4.2 Personnel Composition i. At the minimum, personnel experienced in operations, maintenance, inspection, corrosion specialist, HSE and process disciplines that are familiar with the equipment/devices under review shall be present. ii. DPR representative(s) shall be present at any RBI assessment workshop to fully participate and ensure adherence to the statutory and technical requirements. iii. All personnel participating in the RBI assessment shall be fully trained in the program to understand the implication of the contributions and decisions made. The training shall be documented and produced on demand. iv. The lead facilitator shall possess requisite certifications in and demonstrable knowledge of applicable Industry Codes and Standards such as API 510, 570, 571, 576, 580, 581, 653 and/or any other internationally recognized certifications on inspections, with a minimum of five (5) years cognate working experience in the discipline (RBI). 3.4.3 Baseline Inspections Baseline inspections shall be conducted and documented for new facilities or facilities without appropriate inspection data, prior to the commencement of RBI assessment. This inspection shall be performed by a qualified third-party body/company in the presence of DPR representative(s) who shall witness and participate in the baseline inspection data field gathering and other related activities. 3.4.4 RBI ASSESSMENT RESULT i. The RBI assessment method, processes and assumptions approved in principle by the DPR shall be strictly followed during the assessment to arrive at the Maximum
CodesPDF20202020-0813