Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Page 14 of 20
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020 Revision Date: 1st August 2020 This is a property of the Department of Petroleum Resources. All rights reserved 10 Inspection Interval (MII) for each piece of equipment/device under review. The inspection to be performed at this interval shall be major, internal and/or performance of tests/recertification for each equipment/device as applicable. ii. The results containing the information in Table 3.1 for each of the assessed equipment/device shall be submitted to the DPR in both hard and soft copies (Microsoft Excel format) at the end of the RBI assessment for approval. Table 3.1: RBI Assessment Results Submission Format S/N Elements Notes 1 Submission Date 2 Facility Name Full Facility name 3 Equipment Type Pressure Vessel, Pressure Relief Devices, etc 4 Equipment Description E.G. Scrubber, Pilot Operated Valve 5 Equipment Serial Number 6 Equipment Tag Number 7 Equipment Manufacturer 8 Equipment Installation Date 9 Last Inspection Date 10 Last NDT Inspection Type Performed NST Inspection Type performed (Magnetic Particle Testing (MT); Radiographic Testing (RT); Ultrasonic Testing (UT) Etc) 11 Likelihood of Failure Ranking Equipment Criticality Ranking 12 Consequence of Failure Ranking Equipment Criticality Ranking 13 RBI Assessment Date The date equipment/ device was RBI-assessed 14 Maximum Inspection Interval 15 Next Inspection Date Last Inspection Date + Maximum Interval 16 Proposed NDT Inspection Type NST Inspection Type performed (Magnetic Particle Testing (MT); Radiographic Testing (RT); Ultrasonic Testing (UT) Etc) 3.5 RBI Approvals After a satisfactory outcome of the RBI assessment and upon the submission of the RBI results, the DPR shall validate and issue a final RBI implementation approval for the assessed equipment/devices of a facility under review. Table 3.1: RBI Assessment Results Submission
CodesPDF20202020-0814