Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Page 15 of 20
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020 Revision Date: 1st August 2020 This is a property of the Department of Petroleum Resources. All rights reserved 11 Two (2) levels of approvals are therefore required to be obtained before the implementation of RBI on any equipment/device: Approval-in-principle to apply RBI methodology and Final Approval to implement RBI on a facility following a successful assessment for that particular facility. Any facility for which a FINAL RBI approval is yet to be obtained, shall be regarded as being operated under the prescriptive inspection regime in line with MOSR and other applicable legislation(s). 4. RBI IMPLEMENTATION REQUIREMENTS 4.1 RBI Methodology After RBI approval has been obtained, the following shall be applicable: i. The RBI methodology and program approval issued to an Operator shall be reviewed within a maximum of five (5) years from the last review or whenever a change/review of the methodology is made; whichever comes first. ii. Owner-user audit and upgrade/update carried out on the RBI too shall be validated by the Department. iii. The application of an Approved RBI methodology principles by an operator shall be consistent for all RBI assessments conducted for equipment/facility. iv. Any contractor or third-party involvement in the RBI process must be subjected to the relevant procedure(s) and methodology. The inspection and maintenance management including roles, responsibilities and competencies must be defined to the satisfaction of the Department. 4.2 RBI Validation i. All assessed equipment shall be inspected within their respective Maximum Inspection Intervals. ii. Any submitted RBI assessment results (as per 3.4.4 (ii)) shall ALWAYS be kept and maintained at the respective facility locations and made available to DPR
CodesPDF20202020-0815