Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Page 16 of 20
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020 Revision Date: 1st August 2020 This is a property of the Department of Petroleum Resources. All rights reserved 12 officers/inspectors on demand. Failure to do so shall be considered a non- compliance. iii. Any deviation or non-conformance (i.e. to exceed the Maximum Inspection Intervals) due to technical/operational constraints shall be documented in line with the approved procedure(s) and assented to by the Operator’s management. iv. Any inspection deviation or non-conformance for any equipment/device with a criticality ranking above MEDIUM as per the obtained RBI risk assessment results, shall be submitted to the Department with justification for review and approval. v. RBI reassessment shall be conducted for any RBI-assessed facility within a maximum of five (5) years from the last assessment/reassessment or whenever there is a change or modification of the facility; whichever comes first. vi. After any RBI reassessment, the results shall be submitted to the Department in line with Section 3.4.4 (ii). 4.3 RBI Annual Reports Annual report for a preceding year shall be submitted to the Department by the third (3rd) week of every January in both hard and soft copies (Microsoft Excel) with the following details: a. The inspections performed (facility-wise) for all equipment/devices due within the reporting year. The inspection report shall contain the following; i. Equipment/Device Description ii. Equipment/Device serial number iii. Equipment/Device tag number iv. Inspection Date v. Inspection Type vi. Summary Inspection result vii. Next Inspection Date
CodesPDF20202020-0816