Library / Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020
Page 5 of 20
Applicable to all Oil & Gas Operators GUIDELINES FOR THE IMPLEMENTATION OF RISK BASED INSPECTION IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0022 - 2020 Revision Date: 1st August 2020 This is a property of the Department of Petroleum Resources. All rights reserved 1 1. SCOPE This guideline sets out the procedure for the implementation of the directives of the Director of Petroleum Resources with respect to Risk Based Inspection (RBI) on Fixed (Pressure) Equipment in the Nigerian Oil and Gas Industry pursuant to Regulation 15 of the Mineral Oils (Safety) Regulations, 1963 (MOSR) which requires that the testing and inspection of such equipment be carried out to the Director’s satisfaction. This document also explains the procedure and requirements of various directives and approvals being issued pursuant to Regulations 44 and 45 of the Petroleum (Drilling and Production) Regulations, 1969 and other applicable Regulations/Laws regarding RBI implementation in the industry. This guideline is the updated version of “Guidelines Concerning Implementation and Use of Risk Based Inspections in the Nigerian Petroleum Industry, 2006”. 2. DEFINITION & PURPOSE RBI is a process which aims to assess the risks of operating an equipment/device in a facility, then prioritizes and plans the inspection type and the intervals based on these risks. Risk analysis is a means to identify focal areas in order to meet the acceptance criteria for risk and to enhance the safety level in activities. Risk analysis provides knowledge concerning risk(s) connected with activities and constitutes a basis for the decision-making process so as to plan and implement activities in accordance with the intent of the applicable legislation and with an Operator’s own safety requirements. Whereas the MOSR and other statutory guidance prescribes statutory maximum inspection intervals for various groups of equipment such as pressure vessels, boilers, tanks and pressure relief valves, the RBI approach is risk-based as the terminology implies. The maximum inspection intervals generated from RBI assessments generally differ from that which is prescribed. The Department currently reviews requests from Operators wishing to adopt
CodesPDF20202020-085