Library / GUIDELINES FOR WHOLESALE GAS AND PETROLEUM LIQUIDS SUPPLY OPERATIONS_GUIDE_2_2024
GUIDELINES FOR WHOLESALE GAS AND PETROLEUM LIQUIDS SUPPLY OPERATIONS_GUIDE_2_2024
Page 14 of 18
Applicable to • Midstream and Downstream Petroleum Operators • Lease Holders GUIDELINES FOR WHOLESALE GAS AND PETROLEUM LIQUIDS SUPPLY OPERATIONS Code: NMDPRA Guide- 2-2024 Revision Date: 9th September 2024 This is a property of the Nigerian Midstream and Downstream Petroleum Regulatory Authority. All rights reserved. 10 b. Upon meeting all NMDPRA requirements, the application shall be forwarded to the Federal Ministry of Industry, Trade, and Investment, (FMITI) for issuance of the export permit. 4.4 Petroleum Liquids Evacuation for Export Process 4.4.1 Tanker Movement Information The following information on tankers nominated to lift petroleum liquids at facilities, shall be supplied by all WPLSL holders to the NMDPRA within the deadlines stipulated hereunder 4.4.2 Advance Tanker Program i. This shall contain the schedule of tankers expected to call at the facility in a particular month giving such information as the name and expected time of arrival (ETA), parcel size and the consignor. ii. It shall be furnished within the first week of the month in question and any amendments to the program shall be promptly notified to the NMDPRA not later than 72 hours before the arrival of the tanker. 4.4.3 Tanker Manifest On arrival of a tanker/vessel at the berth point, the following information shall be supplied to the NMDPRA. i. Name of tanker ii. Country of registration iii. Owner of tanker iv. Summer dead weight of tanker v. Last port of call vi. Quantity and type of petroleum and petroleum product filled vii. Destination of tanker after loading viii. The IMO number of the vessel ix. The agent of the vessel 4.4.4 Tanker Loading Schedule a. On berthing the tanker preparatory to loading, a schedule shall be prepared for the loading operations and should contain the following information for granting loading clearance: i. Name of Berth in use ii. Estimated time of commencement of loading iii. Quantity and type of cargo on board arrival iv. Tonnage of petroleum liquids to be loaded
GuidelinesPDF20242024-0914