Library / Applicable to all Oil & Gas Operators and Service Providers GUIDELINES AND REQUIREMENTS FOR WORK AT HEIGHT AND IN CONFINED SPACES IN THE NIGERIAN OIL AND GAS INDUSTRY
Applicable to all Oil & Gas Operators and Service Providers GUIDELINES AND REQUIREMENTS FOR WORK AT HEIGHT AND IN CONFINED SPACES IN THE NIGERIAN OIL AND GAS INDUSTRY
Page 9 of 25
Applicable to all Operators and service companies GUIDELINES AND REQUIREMENTS FOR WORK AT HEIGHT AND IN CONFINED SPACES IN THE NIGERIAN OIL AND GAS INDUSTRY Code: DPR Guide 0037 – 2020 Revision Date: 2nd October 2020 This is a property of the Department of Petroleum Resources. All rights reserved. 9 ii. Installation of anchors shall be done by a competent person in accordance with the designer’s and/or manufacturer’s guidelines. Anchors must be tagged with the installer name, installation date, rated load and other relevant information; iii. Anchors and anchorage points shall not be located on sharp, rough edges or hot surfaces, at corners or edges with potential to cut, abrade or chafe fall protection equipment; vi. Anchors and anchorage points shall be fully examined and certified in accordance with the manufacturer’s instructions or every six (6) months by a competent person; and vii. A register of fall protection equipment including anchors and anchorage points shall be maintained. In addition, the inspection and maintenance of equipment shall be tracked. Note: Further reference on anchors and anchorage points are covered in the DPR Guidelines and Procedures for Lifting Equipment and Lifting Operations which can be found on the DPR website via www.dpr.gov.ng. 2.3 Risk Assessment and Work Procedure For WAH For all WAH activities, a risk assessment shall be carried out, documented and made available on demand. At a minimum, the following requirements shall be satisfied: i. The variables such as nature of the work, loads, fall distance and weather conditions shall be considered; ii. The risk assessment shall be carried out by competent persons; iii. The risk assessment, Standard Operating Procedures (SOP) and emergency response plan, shall be developed in line with global best practices and recommendations from internationally recognised standards;
CodesPDF20202020-109