B 785 (f ) all chains, ropes, lifting tackle, hook and brake system of the crane or hoist shall be inspected and maintained as recommended by its manufacturer ; (g) general preventive maintenance shall be carried out on every crane and hoist as recommended by the manufacturer or at intervals of not more than 12 months ; (h) periodic maintenance records shall be kept and made available on demand by the Authority ; (i) pipeline used in an operation shall be designed, constructed and maintained in accordance with the relevant provisions of the ANSI, ASME, DNV, NACE and other applicable national and international standards and best practice and in compliance with the relevant guidelines issued by the Authority ; (j) a pipeline shall be put into operation unless commissioning approval has been obtained from the Authority ; (k) the right of way of every pipeline shall be free of over-growth, weeds to allow for free access to carry out operational tests, and any other maintenance work and for prompt detection of leakages ; (l) pipelines conveying hydrocarbons shall be designed with pigging facility to allow pigging operation to be conducted at intervals not more than five years ; (m) an initial data gathering shall be obtained from any newly commissioned pipeline and this shall form the basis for the integrity of the facility ; (n) pipeline pressure testing shall be carried out at intervals of not more than five years at pressure of at least 125% of the maximum operating pressure ; (o) a pipeline running on the surface shall be externally coated to meet the relevant provision of the NACE or equivalent standards to prevent atmospheric corrosion attack ; (p) pipeline shall be suitably coated before burial and cathodic protection provided — (i) within 12 months, in the case of dry land, and (ii) within six months, in the case of swamp land, and the cathodic protection system shall be designed and constructed to meet the NACE standards or other internationally recognised equipment standards; (q) cathodic protection potential survey shall be carried out on all buried pipelines at intervals of not more than 24 months to ensure that every section of the protected line attains a negative potential of at least 850mV with reference to copper or copper sulphate reference electrode ;
RegulationsPDF20232023-0615