Library / Extraordinary Federal Republic of Nigeria Official Gazette Lagos - 3rd March, 2023
Extraordinary Federal Republic of Nigeria Official Gazette Lagos - 3rd March, 2023
Page 39 of 42
19. | Operating a lubricant filling plant without LTO. NGN 2,000,000 per year of operation without a licence 30. | Late renewal of lubricant filling plant LTO beyond 31st March | NGN 100,000 of every year. . 21. | Procurement of critical equipment without Factory NGN 5,000,000 Acceptance Test for lubricant filling plant. 2. | Construction of a lubricant filling plant without valid LTE. | NGN3,000,000 23. | Construction of lubricant filling plant without valid LTC. NGN 3,000,000 24. | Modification ofa lubricant filling plant without authorization. | NGN3,000,000 25. | Operation of lubricant filling Plant without valid LTO. NGN 3,000,000 26. | Distributors operating without lubricant storage and sales | NGN 200,000 per year licence. 27. | Retailers operating without lubricant storage and sales | NGN 100,000 per year licence. 28. | Engagement of non- Authority accredited contractors for} Not more than USD fabrication, construction, calibration, testing, or any other | 250,000 and suspension of midstream and downstream activities. not more than | year 29. | Carrying out midstream and downstream activities without | Not more than USD 250.000 Authority oil and gas industry service permit. and suspension of not : : more than | year 30. | Using storage or changing tank product or pipeline product | USD 5,000 service without authorisation. 31. | Measuring petroleum at custody transfer or sales points | USD 10,000 and seizure of with faulty or uncalibrated measuring equipment, Ullage | faulty measuring Transmitting Instrument (UTI) or metering System. instrument 32. | Measuring petroleum products with faulty or uncalibrated | NGN 100,000 and seizure of measuring equipment or Ullage Transmitting Instrument] faulty measuring (UTI). instrument 33. | Conducting a factory acceptance test or site acceptance | USD250,000 test of any critical equipment without authorisation and witnessing by officers of the Authority. 34. | Modification, repair, or alteration of surface or underground | USD 25,000 crude oil storage tanks without authorisation. 35. | Introduction of deadwoods, capillary tube or false bottom, | USD 25,000 etc in crude oil storage tanks. 36. | Construction of a depot without LTC. USD 100,000 37. | Operation of a depot without LTO. NGN 10,000,000 38. | Modification of a depot without authorisation. USD 100,000 39. | Failure to calibrate storage Tank. NGN 250,000 per tank 40. | Backloading in a depot without authorisation. USD5,000
RegulationsPDF20232023-0339