Afrindustria/ Gas Gap Monitor

Library / MIDSREAM-AND-DOWNSTREAM-PETROLEUM-OPERATIONS-REGULATIONS

MIDSREAM-AND-DOWNSTREAM-PETROLEUM-OPERATIONS-REGULATIONS

Page 28 of 42

Open the PDF at page 28

B95 
NGN 100.000 
NGN 0.5 per litre for 
volume 
between 
100,001- 250,000 
(TPBA -PRO3) 
NGN 150.000 
NGN 6.5 per litre for 
volume 
between 
250,00 1-500.000 
(TPBA -PRO4) 
NGN 250,000 
NGN f 
per liter for 
volume at 500,001 
and above (TPBA- 
PROS) 
3rd Party Blending Approvals 
Plant Owner 
NGN 75,000 
NGN 0.5 per liter for 
volume 
fess 
than 
20,000 (TPBA-PLOI) 
NGN 100,000 
NGN 0.5 per liter for 
volume 
between 
20,001-100,000 
(TPBA-PLO2) 
NGN 150,600 
NGN 0.5 per liter for 
volume 
between 
160,001- 250,000 
(TPBA-PLO3) 
NGN 
250,000 
NGN 0.5 per liter for 
volume 
between 
250,00 1-500.000 
(TPBA-PLO4) 
NGN 300,000 
NGN I 
per liter for 
volume at 500,001 and 
above (TPBA-PLOS) 
Revalidation of LTC 
USD1,000 
N/A 
Approval To Modify 
USD 1,000 or its NGN equivalent 
N/A 
Plant/Critical 
Equipment 
Relocation Approval 
USD 2.500 or its NGN equivalent 
N/A 
Tank Calibration Approval 
NGN 300,000 per tank 
N/A 
10. 
Tank Integrity Test Approval 
NGN 300.000 per tank 
N/A 
Lubricant Storage and Sales 
Licence (Lube Distributors 
(E-D1)) 
NGN 209,000 
NGN 50.000 
Lubricant Storage and Sales 
Licence (Lube Distributors 
(E-D2)) 
NGN 150.000 
NGNS50,060